CompetentTechnicalTurnkeySupport

Tacmin Madini is a growing and diversified group of expertise and associates who specialize in the provision of multi-disciplinary advice and solutions to the Openpit minerals sector



Turnkey services
   





 
Home >> Turnkey services >> Mining to rehabilitation

FEATURED MINING COMPANY

KATANGA MINING LIMITED

DEMOCRATIC REPUBLIC OF KONGO

The KOV Mine: is the largest high-grade copper resource in the world.

It comprises four ore bodies – Kamoto East, Oliveira, Virgule and FNSR – accessed via two pits, Kamoto East and KOV.

The Kamoto East pit was operational from 1960 to 1985 and the adjacent KOV pit from 1983 onwards, both under the auspices of the DRC’s state-owned mining company Gécamines.

From 1960 to 2000 (when mining activities ceased and the pit flooded), 38 million tons of ore containing 2.2 million tonnes of copper and almost 200,000 tons of cobalt had been mined.

The Musonoie-T17 open-pit Mine: is the initial oxide source for the mine complex. It is a new site, with no significant production history to date. Pre-stripping began in May 2007 and the first blast was fired at the end of September 2007.

Mashamba East open-pit Mine: Operated from 1985-1988, producing a total of 9.8 million tonnes of ore at an average grade of 4.96% copper and 0.35% cobalt. By 1998, the pit was allowed to flood due to a lack of funds. Mashamba East will form part of Katanga’s oxide production during later years; a dewatering schedule will be developed accordingly.


Design, plan and mine

Engineering, technical and turnkey management

Mine planning and implementation

Our CEO, a former director of one of South Africa’s largest open pit contract miners, has multiple years of experience in the procurement, cost engineering, resourcing, start-up, management and operating of open pit mines.
Tacmin Madini during a Design, plan and mine contract provides and takes responsibility of:

Mine Planning

Pit optimisations and practical mine designs
Fleet selections, productions and allocations plan
LOM, medium and short term planning
Production and ore grade schedule
Mining cost and budget forecasts

Production and ore grade targets

Implementation of the mine plan
Production and ore grade targets
Budget forecast conformance

Owner operator mining

Equipment selection and recommendations
Mining equipment maintenance systems, implementation and control

Contract mining

Equipment selection and recommendations
Management and administration of the mining contract

Contract type

A Design, plan and mine contract may be set on a time or performance type of contract arrangement. This type of contract has been found to be a particularly successful form of incentive. For any enquiries in respect of your outsourced requirements, contact sblaauw@tacmin.co.za.

 